Principles
- Collect once, calculate everything else
The customer enters operational quantities once, from their source records; Yarta verifies them. Every emission, rate, intensity, trend and score is calculated from them, so a figure cannot disagree with the numbers behind it.
- Raw numbers in, no typed percentages
Litres, kilowatt-hours, gigajoules, kilolitres, tonnes, hectares and counts. Nobody types a rate Yarta can calculate. The only percentages entered are measured ones, such as a bin audit's contamination rate.
- Every factor has an edition
Each factor is recorded with its source and edition, so any figure can be traced to the factor that produced it.
- Two emissions figures, never netted
Operational emissions are what the organisation emitted. Avoided emissions are a modelled estimate of what recycling avoided elsewhere. They are reported separately and never subtracted from each other.
Emissions
All emissions are in tonnes of carbon dioxide equivalent (t CO₂-e), calculated each month from the raw quantities entered.
Scope 1: fuels
Scope 1: natural gas
Scope 2: grid electricity
The state comes from the organisation profile. Western Australia uses the factor for the South West Interconnected System (SWIS).
Scope 3: reported categories
- Landfill factor: Council 1.6; Business, Government agency and Other 1.3 t CO₂-e per tonne (mixed municipal solid waste, and commercial and industrial waste); construction businesses 0.2 (mixed construction and demolition waste)
- Upstream fuels: litres ÷ 1,000 × GJ/kL × Scope 3 factor (kg CO₂-e/GJ) ÷ 1,000
- Upstream gas: GJ × the state's Scope 3 gas factor ÷ 1,000
- Upstream electricity: kWh × the state's Scope 3 factor ÷ 1,000
These are the Scope 3 categories Yarta reports today, following the category structure of the GHG Protocol Corporate Value Chain (Scope 3) Standard. Business flights are recorded but not yet converted: see Limitations.
Total operational emissions
Avoided emissions, reported separately
An estimate of emissions avoided elsewhere because material was recycled rather than made new. It is shown beside operational emissions, never deducted from them, and never an offset.
Factors
EditionNational Greenhouse Accounts Factors 2024 (DCCEEW), as reproduced in the Commonwealth Emissions Reporting Framework 2024–25
Grid electricity and natural gas, by state
| State or territory | Electricity Scope 2 kg CO₂-e/kWh | Electricity Scope 3 kg CO₂-e/kWh | Natural gas Scope 3 kg CO₂-e/GJ |
|---|---|---|---|
| VIC Victoria | 0.77 | 0.09 | 4.0 |
| NSW New South Wales | 0.66 | 0.04 | 13.1 |
| ACT Australian Capital Territory | 0.66 | 0.04 | 13.1 |
| QLD Queensland | 0.74 | 0.10 | 8.8 |
| SA South Australia | 0.23 | 0.05 | 10.7 |
| WA Western Australia (SWIS) | 0.51 | 0.06 | 4.1 |
| TAS Tasmania | 0.15 | 0.03 | 4.0 |
| NT Northern Territory | 0.56 | 0.07 | 4.0 |
Electricity is location-based. Natural gas Scope 1 is 51.53 kg CO₂-e/GJ in every state. Scope 3 gas factors are metropolitan values.
Fuels
| Fuel | Energy content GJ/kL | Scope 1 kg CO₂-e/GJ | Scope 3 kg CO₂-e/GJ | Scope 1 per litre kg CO₂-e/L |
|---|---|---|---|---|
| Diesel | 38.6 | 70.50 | 17.30 | 2.721 |
| Petrol | 34.2 | 67.62 | 17.20 | 2.313 |
| LPG | 26.2 | 61.00 | 20.20 | 1.598 |
| Biodiesel or renewable diesel | 34.6 | 2.50 | 0.00 | 0.087 |
Diesel: Scope 1 is 70.41–70.50 kg/GJ by vehicle type; 70.5 used. Scope 1 per litre is calculated from the energy content and the Scope 1 factor.
Waste to landfill
| Organisation type | Factor t CO₂-e per tonne | Basis |
|---|---|---|
| Council | 1.6 | Mixed municipal solid waste |
| Business | 1.3 | Commercial and industrial waste |
| Government agency | 1.3 | Commercial and industrial waste |
| Other | 1.3 | Commercial and industrial waste |
| Construction business | 0.2 | Construction and demolition waste |
Applied to general waste to landfill, as a Scope 3 category. A construction business is set by its sector, because most of what it landfills is mixed construction and demolition waste.
Avoided emissions, reported separately
| Material recovered | Factor t CO₂-e avoided per tonne |
|---|---|
| Steel | 0.44 |
| Aluminium | 17.72 |
| Plain timber | 1.35 |
| Green waste | 0.32 |
| Concrete | 0.02 |
| Tyres | 1.07 |
NSW DECCW (2010), Environmental benefits of recycling. Flagged as dated. A modelled estimate, never deducted and never an offset.
Default unit weights
| Item | Weight kg each | Used for |
|---|---|---|
| Mattress | 80 | Mattresses recovered |
| Tyre | 9.5 | Tyres recovered, and avoided emissions for tyres |
| Whitegood | 60 | Whitegoods recovered |
Counts are converted to tonnes with these defaults unless the items are weighed.
Rates and intensities
Every rate and intensity is calculated from the raw numbers, never typed. Plug-in hybrids count as half an electric vehicle. Recovery, diversion and renewable shares are capped at 100%. In the score, rates are taken over the last 12 months together, except fleet electrification, which uses the current fleet.
| Figure | Unit | Calculation |
|---|---|---|
| Fleet fuel efficiency fleet_eff | L/100 km | (diesel + petrol + LPG + biodiesel) ÷ fleet km × 100 |
| Fleet electrification fleet_ev_pct | % | (battery electric vehicles + electric trucks + ½ × plug-in hybrids) ÷ all vehicles × 100 |
| Renewable electricity share renew_pct | % | (renewable purchased + solar consumed onsite) ÷ (grid electricity + solar consumed onsite) × 100 |
| Electricity per employee elec_per_fte | kWh/FTE | grid electricity ÷ employees |
| Electricity per m² elec_per_m2 | kWh/m² | grid electricity ÷ floor area |
| Alternative water share alt_water_pct | % | (recycled + rainwater + stormwater + wastewater reused) ÷ all water used × 100 |
| Water per employee water_per_fte | kL/FTE | potable water ÷ employees |
| Water per facility water_per_site | kL/site | potable water ÷ facilities |
| Water per resident serviced water_per_res | L/resident | potable water × 1,000 ÷ residents |
| Total recovered recovered_t | t | sum of every recovered stream (mattresses at 80 kg, tyres at 9.5 kg, whitegoods at 60 kg) |
| Resource recovery rate recovery_pct | % | total recovered ÷ total waste generated × 100 |
| Landfill diversion rate diversion_pct | % | (total waste − landfill) ÷ total waste × 100 |
| Reuse rate reuse_pct | % | furniture reused ÷ total waste × 100 |
| Waste per resident waste_per_res | kg/resident | total waste × 1,000 ÷ residents |
| Waste per employee waste_per_fte | kg/FTE | total waste × 1,000 ÷ employees |
| Recycled-content procurement share proc_recycled_pct | % | recycled-content spend ÷ total spend × 100 |
| Data completeness data_complete_pct | % | mandatory fields supplied ÷ mandatory fields due × 100 |
| Evidence share evidence_pct | % | fields backed by an attached document ÷ fields supplied × 100 |
| Emissions per resident emis_per_res | kg CO₂-e/resident | total emissions × 1,000 ÷ residents |
| Emissions per employee emis_per_fte | t CO₂-e/FTE | total emissions ÷ employees |
From the data dictionary. Per-resident figures apply to councils; per-m² and per-facility figures need the floor area and facility count in the profile.
The Yindyamarra Environmental Score
One monthly score out of 100. Each of the ten categories is scored from 0 to 100 by the rule below. The overall score is the average of the category scores that have data, rounded to a whole number, with each category counting equally.
Category rules
| Category | Rule |
|---|---|
| Energy & Renewables | 60% renewable electricity share (rolling 12 months) + 40% grid electricity use against the baseline (20% lower scores full marks, 20% higher scores none). |
| Fleet & Transport | 60% fleet electrification (50% electric scores full marks) + 40% fuel use against the baseline (±20%). |
| Carbon & Emissions | Total operational emissions over the last 12 months against the baseline year (30% lower scores full marks, 30% higher scores none). |
| Water | 50% alternative water share (50% scores full marks) + 50% potable water use against the baseline (±20%). |
| Waste & Resource Recovery | 70% landfill diversion rate + 30% contamination (0% scores full marks, 20% or more scores none). |
| Circular Economy | 50% recycled-content procurement share (30% scores full marks) + 30% reuse rate (10% scores full marks) + 20% stewardship programs (three or more scores full marks). |
| Land & Soil | Hectares rehabilitated or remediated in the last 12 months against the annual target. |
| Biodiversity & Nature | 50% trees planted against the annual target + 50% hectares of native vegetation, habitat and wetland restored against the annual target. |
| Community & Participation | Program participants in the last 12 months against the annual target. |
| Governance & Improvement | 50% data completeness + 30% evidence share (last three months) + 20% complaints and incidents closed. |
Bands
| Band | Score |
|---|---|
| Leading | 80 and above |
| Strong | 65 to 79 |
| Developing | 50 to 64 |
| Starting | Below 50 |
Provisional and not reported
- Unverified monthsA month is provisional until Yarta verifies it, and so is any score that includes it.
- Target-based categoriesLand, Nature and Community are scored against annual targets, pro-rated until a full year of data exists. They are provisional until there are 12 months of data.
- Categories with no dataShown as not reported and not scored. The score states how many of the ten categories it covers.
Direction of travel and baseline
Scores are shown month on month, year on year (against the same month a year earlier), over rolling 12 months, and against the baseline year set in the organisation profile. Trend parts of category scores compare the last 12 months with the same calendar months of the baseline year, so comparisons are seasonal. Where a baseline month is missing, the baseline year's monthly average stands in.
Default targets and the eco standards
Targets come from the organisation profile. Where an organisation has not set one, the score uses these defaults. For "at the eco standards", the published standard is the floor: 80% landfill diversion (National Waste Policy Action Plan) and 82% renewable electricity (national target), with the organisation's own target applying where it is tighter. The standards are listed with their sources on the eco standards page.
| Target | Default | Unit | Used in |
|---|---|---|---|
| Emissions reduction target | 30 | % by 2030 | Shown against actual performance |
| Renewable electricity target | 50 | % | Shown against actual performance |
| Landfill diversion target | 70 | % | Shown against actual performance |
| Fleet electrification target | 30 | % | Shown against actual performance |
| Trees planted per year (target) | 2,000 | trees | Nature score |
| Land rehabilitated per year (target) | 10 | ha | Land score |
| Program participants per year (target) | 3,000 | people | Community score |
| Native vegetation, habitat and wetland restored per year (target) | 6 | ha | Nature score |
Targets, potential and recommended help
Each monthly report shows three numbers and a roadmap. Recommendations come from the published rules below, so any organisation with the same figures gets the same recommendations, and can book the help with Yarta or use any provider.
The three numbers
| Number | How it is worked out |
|---|---|
| Now | The Yindyamarra Environmental Score for the latest verified month. |
| At the eco standards | The same month's figures with each published eco standard, or your target where it is tighter, treated as met: emissions reduction, renewable electricity, landfill diversion, fleet electrification, trees planted, hectares restored, land rehabilitated and program participants. Figures without a target stay as they are. |
| With Yarta help (estimate) | The same month's figures with the assumed effect of every recommended item in your plan applied in full, once each has had time to take effect. An upper estimate: each item is also shown as a range from half its assumed effect to the full. Items you switch off are left out. |
Recommendation rules and assumed effects
| Help | Recommended when | Assumed effect (estimate) | Delivered by |
|---|---|---|---|
| Hard-waste and bulky-item recovery program For businesses: Bulky-item clear-out and recovery | Landfill diversion is below your target, and bulky items (mattresses, whitegoods, furniture or e-waste) appear in your waste figures. | Landfill diversion up 3 percentage points and reuse up 0.5 points. Landfill emissions fall with the tonnes diverted. | Recycle Group business. Recycle Group collections collect. The Mattress Recycling Company processes mattresses. Recycle Warehouse rehomes furniture through charities. |
| Kerbside contamination blitz For businesses: Bin contamination audit and staff training | Your latest bin audit shows contamination of 10% or more. | Contamination down 4 percentage points, to no lower than 5%. | Independent specialist. Bin auditors and resident or staff educators. |
| Fleet transition plan | Fleet electrification is below your target. | Half of the cars and light vehicles you retire each year are replaced with electric ones, at your own rate of replacement (from your fleet register, at most a fifth of the fleet a year), for two years. Trucks are left out. Fuel use and fleet emissions fall with the vehicles replaced. | Independent specialist. Fleet and electric-vehicle advisers. |
| Energy and electrification audit | Renewable electricity is below your target, or grid electricity is less than 5% below the baseline months. | Renewable share up 10 percentage points and grid electricity down 5% once the actions are carried out. Scope 2 emissions fall in proportion. | Independent specialist. Energy auditors, with solar, battery and heat-pump specialists. |
| Illegal dumping response | Fewer than 90% of environmental complaints and incidents closed, or 24 or more in 12 months and rising on the 12 months before. Councils and government agencies only. | The share of complaints and incidents closed rises to 100%. | Recycle Group business. The group's collection business removes dumped rubbish. Prevention is planned with your compliance team. |
| Water efficiency and leak hunt | Potable water is less than 5% below the baseline months, or alternative water is under 20% of all water used. | Potable water down 8% and the alternative water share up 4 percentage points. | Independent specialist. Water auditors, with leak-detection, stormwater and irrigation specialists. |
| Evidence upgrade session For businesses: Auditor-ready Scope 3 review | Any category graded C in the last three months, or less than 80% of figures backed by A or B evidence. | Figures backed by A or B evidence, and data completeness, both rise to 100%. | A Yarta analyst who does not enter or verify your months. |
| Recycled-content procurement review | Recycled-content spend is under 20% of procurement spend over 12 months. | Recycled-content share up 6 percentage points, and one more product stewardship program (to a maximum of three). | Independent specialist. Procurement advisers, recycled-content suppliers and take-back schemes. |
| Planting and habitat days | Trees planted, hectares restored or program participants are under 90% of your target for the period. | Trees planted and hectares restored reach your targets, and program participants rise 10%. | Independent specialist. Local Landcare groups and Traditional Owner ranger programs, engaged and paid on their terms. |
| Grant application pack | Two or more other recommendations apply. | No direct change to the score. It can fund the other items. | Independent specialist. A grants writer. |
Effects are applied to the measures behind the score for the latest 12 months, then scored with the same rules as the score itself. Each is an assumption for discussion in method v0.1.
The roadmap
Booked items start in the month booked. The others start from next month, two a quarter, weakest category first. Each kind of help has its own lead time before it shows in your figures and its own build-up to full effect: from three months for water leaks and evidence to two years for fleet replacement, at your own rate of retiring vehicles. Estimated changes run from half the assumed effect to the full effect. Everything else is held at the latest 12 months. Work completed in the last 6 months is not recommended again; its effect shows only in later verified figures.
| Help | Months before it shows | Months to full effect | Why |
|---|---|---|---|
| Bulky-item clear-out and recovery | 1 | 6 | New collections can start within a month; the share of bulky items recovered builds over about six months. |
| Bin contamination audit and staff training | 1 | 4 | Signage and bin changes act quickly; the contamination rate settles over a few collection cycles. |
| Fleet transition plan | 6 | 24 | Vehicles change only when they are due for replacement, and new ones take months to order. The pace comes from how many vehicles you retire each year. |
| Energy and electrification audit | 3 | 12 | A GreenPower switch shows within a couple of billing cycles; solar, efficiency work and supply contracts take most of a year. |
| Illegal dumping response | 1 | 6 | Faster removal closes reports within a month; the backlog clears over about six months. |
| Water efficiency and leak hunt | 1 | 3 | Fixed leaks show on the next bills; other savings build over a quarter. |
| Auditor-ready Scope 3 review | 1 | 3 | Better documents can start with next month's figures and cover every category within a quarter. |
| Recycled-content procurement review | 6 | 12 | Recycled-content options come in as contracts renew, which for most organisations is once a year. |
| Planting and habitat days | 3 | 12 | Planting follows the season, and programs build up over a year. |
The chart on the roadmap shows the last 12 months of scores, then the projection month by month, with a line at the score your targets would give. A booking marked done changes nothing by itself: the change shows only in the months that follow, as they are entered and verified.
Independence
- Published rulesThe rules and assumptions are published in the Yarta method, and the same rules apply to every organisation.
- Any providerYou can use any provider. Recommendations, your score and the verification of your figures do not depend on who does the work.
- DisclosureWork by a Recycle Group business (The Mattress Recycling Company, Recycle Warehouse or the group's collection business) is disclosed on your monthly report. Yarta is part of Recycle Group.
- Only through the figuresCompleted work changes your score only through the figures entered and verified in later months, like any other change.
- Separate peopleA Yarta analyst who runs a paid session for you does not enter or verify your months.
- EstimatesThe score with Yarta help and the projection are estimates. They are not a promise, a guarantee or a target.
Benchmarks
Yarta benchmarks a score against published industry figures and the eco standards, never against another customer's data. No customer's figures are shared with anyone, and no customer is identifiable in anything Yarta publishes.
- Eco standardsThe published national and state targets on the eco standards page: the bar for "at the eco standards" on every report.
- Industry benchmarksPublished figures for the organisation's sector, printed on the report beside the organisation's own figure with the source and the period the figure covers. Three are matched to the bars on page 1 (waste recovery, renewable electricity, fleet electrification); the rest are related published figures printed on page 2 for context. The table below is the current edition; where a sector has no published figure for a metric, the report says so and compares the organisation with its own baseline and target.
- Your own historyEvery category is compared with the same months of the baseline year and with last month and last year.
- What Yarta does not doPool customer data into a peer average, or show one customer where another sits. If a de-identified industry index is published in future, it will be opt-in, aggregated, and described in this method first.
Benchmarks v0.1 · sources checked 29 September 2026
| Metric | Sectors | Benchmark | Source |
|---|---|---|---|
| Waste recovery · councils | Councils | 41% of municipal waste recycled, all 128 NSW councils, 2024–25 | NSW EPA, Local Government Waste Data Survey 2024–25 |
| Waste recovery · commercial and industrial | Business, health, education, manufacturing, retail, logistics | 51% of C&I waste recovered, NSW, 2022–23 | NSW State of the Environment 2024 |
| Waste recovery · construction and demolition | Construction | 81% of C&D waste recovered, Australia, 2022–23 | National Waste and Resource Recovery Report 2024, DCCEEW |
| Renewable electricity | All | 43% renewable share of Australia's electricity, 2025 (the grid average) | Clean Energy Council, Clean Energy Australia 2026 |
| Fleet electrification | All | 13% of new light vehicles registered in 2024 were battery-electric | National Transport Commission, light vehicle emissions intensity 2024 |
| Related figures · councils | Councils | Kerbside recycling contamination 9.9% (Vic, 2019–20); yellow-bin material recycled 90% and 73% of households with an organics service (NSW, 2024–25); 512 kg of municipal waste per person (Australia, 2022–23) | Sustainability Victoria; NSW EPA; DCCEEW |
| Related figures · materials | By sector | National resource recovery 66%; metals 90%; organics 62%; glass 61%; paper and cardboard 56%; plastics 12.5%; building and demolition materials 84%; tyres 56% (Australia, 2022–23) | National Waste and Resource Recovery Report 2024, DCCEEW |
| Related figures · packaging | Retail, manufacturing, business | Average recycled content 44%; 86% of packaging reusable, recyclable or compostable; plastic packaging recycling 20% (Australia, 2023–24) | APCO, Australian Packaging Consumption and Recovery Data 2023–24 |
| No published average | Business, health, education | Office energy (NABERS rates buildings, no national average intensity is published); hospital energy and water (NABERS public hospital ratings, averages not published); campus energy and water (TEFMA member data) | Stated on the report; the organisation is compared with its own baseline and target |
Every benchmark is versioned with this method. When a source publishes a new edition, the benchmark edition changes and the report names the edition it was calculated under.
Providers and accreditation
Every suggestion on a roadmap can be booked. Yarta introduces the provider; the customer can use any provider. Every provider Yarta introduces holds the licence or accreditation the work requires, and the report names who did the work.
| Kind of help | What the provider must hold |
|---|---|
| Waste collection and resource recovery | An environment protection licence or registration for the activity in the state where it is done, and processor certificates for every stream delivered. E-waste goes only to processors certified to AS/NZS 5377. |
| Energy audits and electrification | Audits to AS/NZS 3598. Solar and battery installers accredited under the Clean Energy Council scheme (Solar Accreditation Australia). Electrical work by licensed electricians. |
| Building ratings | NABERS accredited assessors for NABERS ratings; Green Star accredited professionals for Green Star. |
| Fleet transition | Fleet and EV advisers working from the organisation's own kilometres and fuel data, with charging installed by licensed electricians. |
| Water | Licensed plumbers for works; leak detection and irrigation specialists; water auditors working to the utility's efficiency program. |
| Land, nature and Country | Landcare groups, accredited bush regenerators and Traditional Owner ranger programs, engaged and paid on their terms. Contaminated land work by consultants recognised by the state EPA. |
| Reporting and assurance | Yarta analysts for the data. Where assurance is needed, an independent assurance practitioner; Yarta does not assure its own figures. |
| Grants | Grants writers using the verified Yarta figures as the evidence base. |
Where a Recycle Group business does the work, the report says so. A provider's accreditation is checked before the introduction and recorded against the booking.
Evidence and verification
Customers send the document behind each figure. A Yarta analyst enters the figures and grades each document, and a second Yarta analyst verifies the month.
| Grade | Meaning | For example |
|---|---|---|
| A | Primary document | A bill, docket or certificate |
| B | System extract or reconciled internal record | A report from a finance, fleet, telematics or contractor system, or a register reconciled to source |
| C | Estimate or unsupported | A reasonable estimate, or a figure without a document yet |
- Month statusEach month moves from documents received, to entered, to verified. One Yarta analyst enters the figures and attaches the evidence; a different analyst checks every figure against it and marks the month verified. The person who entered a month cannot verify it. Customers see a month in their reports once it is verified.
- Evidence shareThe Governance score counts figures backed by grade A or B evidence. A document attached but not yet graded counts until Yarta grades it.
- What verification meansA check by Yarta of the figures against their evidence. It is not an audit or independent assurance.
Boundary and sectors
Every organisation reports on the same ten categories. The sector profile sets which streams are expected, which intensity the report leads with (per resident, bed, student, site, vehicle or employee), and which benchmarks apply. The eight profiles are on the sectors page. Streams a sector does not report are left out of the score, not scored zero.
The organisation confirms its reporting boundary with Yarta: which sites, facilities, fleets and services are included. For councils, the waste figures include the municipal kerbside service (garbage, recycling, food and garden organics and glass) and transfer stations, as well as waste from council operations and buildings. Landfill emissions from that waste are part of Scope 3.
Limitations
- FlightsRecorded as domestic and international trips, but not converted to emissions until a factor is adopted, so they are not yet in the totals.
- Other fuelsRecorded with their type and quantity, but not converted until a factor is set.
- Avoided-emissions factorsFrom NSW DECCW (2010) and flagged as dated. Avoided emissions are a modelled estimate and are always reported separately.
- Interim factorsDiesel uses a single Scope 1 factor of 70.5 kg CO₂-e/GJ, where the published values range from 70.41 to 70.50 by vehicle type. Scope 3 gas factors are metropolitan values.
- Unit weightsMattresses, tyres and whitegoods reported as counts are converted with default weights unless they are weighed.
- Landfill factorOne default factor per organisation type (and for construction, per sector), not specific to the landfill used or how it manages landfill gas.
- Score rules and weightsA proposal for discussion in method v0.1, together with the default targets. They may change before launch.
Claims we don't make
- No carbon neutral, net zero or offset claimsYarta figures report what an organisation used and emitted. They are not a basis for carbon neutral, net zero or offset claims, and Yarta does not make those claims from them.
- Avoided emissions are not an offsetAvoided emissions are a modelled estimate (NSW DECCW 2010 factors), reported separately. Never deducted from your emissions and never an offset.
- The score is self-declaredSelf-declared under the published Yarta method. Not an accredited rating, certification or third-party verification.
Version history
Every report states the method version it was calculated under. When the method changes, earlier reports are not restated unless the customer asks, and Foundation Members are consulted before a change is published.
| Version | Date | What it contains |
|---|---|---|
| v0.1 (draft) | 29 September 2026 | The first published method for the environmental sustainability report. Ten categories, each with a stated scoring rule; the Yindyamarra Score as the mean of the categories reported; bands at 80, 65 and 50; emissions at the National Greenhouse Accounts Factors 2024 (Scope 1, 2 and 3) with avoided emissions reported separately; the eco standards as the floor and the customer's target as the bar; evidence grades A, B and C; declared "not reported" categories; site-level reporting; quarterly and annual roll-ups; Benchmarks v0.1 (sources checked 29 September 2026); provider accreditation requirements. |
| v1.0 (recycling) | September 2026 | The earlier recycling report method (three buckets, steel recovered, Category 5 and avoided emissions). Kept for the recycling report at /recycling-method/. |
Expected next
- Benchmarks v0.2Adds the sector energy and water benchmarks (NABERS public hospital and office data, TEFMA) where they are published, and updates each source to its latest edition.
- FactorsThe NGA factors are updated each year; the factor edition is pinned to every line, so a prior year's figures stay reproducible.
- Avoided-emissions factorsThe NSW DECCW (2010) factors are flagged as dated and will be replaced when a current Australian life-cycle set is adopted.
Sources
- Department of Climate Change, Energy, the Environment and Water (DCCEEW), National Greenhouse Accounts Factors 2024, as reproduced in the Commonwealth Emissions Reporting Framework 2024–25 (Department of Finance, June 2025). Used for energy contents and Scope 1, 2 and 3 emission factors.
- NSW Department of Environment, Climate Change and Water (DECCW), Environmental benefits of recycling (2010). Used for avoided-emissions factors.
- GHG Protocol, Corporate Value Chain (Scope 3) Standard. Used for the Scope 3 category structure.
The Yarta Method
Questions about the method?
Every factor, rule and assumption on this page is open to challenge. Send a question and a Yarta analyst answers it, or send one month of data and see the method applied to it.